• Site web
  • Référence produit
  • Numéro de série
Identification
Identifié sous le nom Nom d'utilisateurDéconnexion
Chargement en cours...
B&R Logo

Workshop: Control and I/O system design [SEM910.1]

The process of designing and implementing the electronics is an important part of a machine's lifecycle. In this phase, system requirements must be harmonized with technical feasibility and available components.

Proper selection of control components and infrastructure is critical. In addition to EMC-compliant installation, it is also important to consider the topology, system limits, ambient conditions and power management calculation for the entire control system.

  • Prerequisites and requirements
    Duration
    Model number
    Basic technical training
    1 day
    SEM910.1
    calendar

Objectives and content

  • B&R system overview
  • Functions of the B&R website
  • User's manuals, data sheets and documents
  • Control and I/O system characteristics
  • Working with the X20 control system
  • Topologies and infrastructure
  • Mechanical and electrical configuration
  • Completing the power management calculation
  • Selecting and constructing the topology
  • Power supply, EMC installation and assembly

Responsibilities include

  • You are responsible for designing or building control cabinets.
  • You are responsible for selecting or purchasing control components.
  • You are responsible for sizing electrical and mechanical systems.
  • You are responsible for installing or commissioning hardware.
Ejemplo
Share
This site uses cookies to enable a better customer experience. By continuing to browse the site you are agreeing to our use of cookies. Please find more information about cookies in our Data privacy statement.